Skip to content

Read the source behind every number.

Each citation carries its scope and limits, so readers can judge what the source supports. Primary records come first whenever they are available.

A Administrative data, audited record, permit, or rule

B Official estimate, review, or disclosed model

C Forecast or transparent working analysis

Showing 18 of 55 matching sources (55 total in the library)

  1. Official reportEvidence grade BJune 2026
    United States Data Center Energy Usage Report: 2025 Update

    Lawrence Berkeley National Laboratory

    Scope
    United States; history through 2024 and scenarios through 2030
    Limitation
    A bottom-up historical estimate and scenario forecast. The forecast does not model future grid-supply constraints or departures from announced demand.
  2. Official reportEvidence grade BDecember 2024
    2024 United States Data Center Energy Usage Report

    Lawrence Berkeley National Laboratory

    Scope
    United States; historical estimates through 2023 and scenarios through 2028
    Limitation
    Modeled national estimates with limited facility-level public data. Location-based emissions and indirect water do not include facility-specific contracts or behind-the-meter supply.
  3. Official reportEvidence grade BAugust 10, 2026
    Electricity Rate Designs for Large Loads: 2026 Update

    Lawrence Berkeley National Laboratory

    Scope
    55 U.S. large-load tariffs available through 2026
    Limitation
    The survey covers 55 published large-load tariffs. It cannot show that any one design will eliminate every cross-subsidy or forecast error.
  4. RegulationEvidence grade AJune 18, 2026
    FERC large-load integration show-cause orders

    Federal Energy Regulatory Commission

    Scope
    All six U.S. regional transmission organizations and independent system operators
    Limitation
    Show-cause orders begin a federal process; they do not establish a final national interconnection rule or determine one project's reliability effect.
  5. AuditEvidence grade BDecember 2024
    Data Centers in Virginia

    Virginia Joint Legislative Audit and Review Commission

    Scope
    Virginia, primarily FY2021–FY2023, with selected forecasts
    Limitation
    Virginia-specific. Several values are stakeholder estimates or model outputs, and future utility-cost scenarios are explicitly uncertain.
  6. Agency dataEvidence grade A2014 and 2024 annual data
    Electricity retail-sales data, Form EIA-861

    U.S. Energy Information Administration

    Scope
    All 50 states; residential average retail price in cents per kWh
    Limitation
    State residential average prices are annual averages. They do not isolate a causal driver of bills or represent an individual utility tariff.
  7. Official reportEvidence grade BPublished 2026
    Powering Intelligence 2026

    Electric Power Research Institute

    Scope
    U.S. data-center annual energy by state; 2024 low, medium, and high estimates
    Limitation
    These modeled estimates draw on incomplete public and commercial project data rather than a census of metered load. EPRI includes cryptocurrency mining, unlike the LBNL national series.
  8. Working analysisEvidence grade CAnalyzed August 12, 2026
    State price-growth and data-center-share analysis

    Data Center Context

    Scope
    All 50 states; EPRI 2024 medium estimate divided by EIA retail sales versus EIA 2014–2024 residential price growth
    Limitation
    This descriptive cross-section cannot establish causation. The share axis derives from EPRI model estimates rather than metered load, and a 2024 endpoint is compared with a ten-year price change.
  9. Official reportEvidence grade BJune 2026
    Revisiting the relationship between demand growth and electricity prices

    Lawrence Berkeley National Laboratory

    Scope
    U.S. electricity-demand growth, prices, infrastructure cost, and cost allocation
    Limitation
    A synthesis of mechanisms and empirical literature. It does not estimate the bill effect of a named data-center project.
  10. Agency dataEvidence grade A2024 annual average
    Historical Consumer Price Index

    U.S. Bureau of Labor Statistics

    Scope
    U.S. city average, all-items CPI-U, annual averages for 2014 and 2024
    Limitation
    National CPI-U is a broad cost-of-living benchmark. It cannot serve as a state-specific electricity-cost index or causal control.
  11. Official reportEvidence grade B2026–2035 outlook, published December 2025
    2025 Long-Term Reliability Assessment

    North American Electric Reliability Corporation

    Scope
    23 North American bulk-power-system assessment areas
    Limitation
    This midpoint planning outlook is assembled from regional submissions and should not be read as a prediction. Data centers are one of several demand and supply drivers.
  12. Official reportEvidence grade B2024 performance, published 2025
    2025 State of Reliability Overview

    North American Electric Reliability Corporation

    Scope
    North American bulk-power-system performance during 2024
    Limitation
    Covers the bulk power system, not most lower-voltage distribution interruptions experienced by customers.
  13. RegulationEvidence grade AFebruary 24, 2026
    Data Center Initiatives factsheet

    Virginia State Corporation Commission

    Scope
    Dominion Energy Virginia qualifying large-load class and contracts
    Limitation
    This is a prospective Virginia rate design. Its safeguards reduce risk but cannot establish the future bill effect of a particular load forecast.
  14. GuidanceEvidence grade ACurrent reference
    Water-use terminology

    U.S. Geological Survey

    Scope
    United States water-use accounting
    Limitation
    Defines accounting terms; it does not quantify data-center use or determine local scarcity.
  15. GuidanceEvidence grade AJanuary 2019
    Cooling Water Efficiency Opportunities for Federal Data Centers

    U.S. Department of Energy

    Scope
    Cooling-water efficiency practices for federal data centers
    Limitation
    Federal-facility guidance. Technology savings and feasibility remain dependent on the site's climate, chemistry, and operating design.
  16. Agency dataEvidence grade AGeneration year 2023; revision 2, June 2025
    eGRID2023 Revision 2 summary data

    U.S. Environmental Protection Agency

    Scope
    U.S. eGRID subregions and national total
    Limitation
    Annual average output rates attribute a regional generation mix. They do not identify short-run marginal dispatch or long-run resources caused by a new load.
  17. RegulationEvidence grade ACurrent rule summary
    Stationary engine New Source Performance Standards

    U.S. Environmental Protection Agency

    Scope
    Stationary compression-ignition engines in the United States
    Limitation
    Specific requirements vary by engine age, size, source classification, and use. The rule summary is not a facility operating record.
  18. PermitEvidence grade AApril 20, 2022
    Air permit 74162

    Virginia Department of Environmental Quality

    Scope
    One Vantage Data Centers campus in Sterling, Virginia
    Limitation
    This is one older Virginia permit. Its caps show maximum allowed emissions; actual emissions require operating data. Newer Virginia control guidance is more stringent.